The problem
This decision is really about three things at once: how much volume the kitchen moves, how much floor space it can give up, and how the line accesses product during service. Get the format wrong and a kitchen either pays for capacity it doesn’t use or runs out of cold storage mid-shift.
Most operators decide based on what the previous space had installed, not on what their actual volume and layout require.