The problem
When the original coil specification doesn’t exist, or doesn’t match what’s actually installed, ordering from a catalog is a guess. In an occupied office tower, a misordered coil isn’t a minor delay, it’s a second tenant-impacting shutdown, a second round of access coordination, and a second set of overtime hours.
Most buildings this old have no usable documentation at all, which makes this the normal case, not the exception.